The water table should overlap the foundation by about 1 in.
Brick water table with siding above.
The sill looks like 5 4 x 6 1 x5 5 but the water table looks lile a different width by the math i ve done.
And be capped on top with either a preformed metal drip cap or a custom flashing installed under the sheathing wrap.
However your installation is plank siding above brick veneer and unlike the two above examples brick veneer is acknowledged as water goes through it and is drained down the back side so keeping water out of the brick is not the big concern keeping water off the back wall behind the brick veneer is a big concern.
If the transition exceeds 10 feet in length it s necessary to use more than one piece of.
We are very excited about the progress being made at our 295 000 square foot manufacturing facility.
Line up the lower edge or butt edge of the first full width clapboard so that it covers the starter strip and lies a hair above the water table.
Secure it to every other stud with one 7d nail.
Prop its thickest edge 1 8 inch above the water table.
Measure the length of the transition the intersection where the brick meets the face of the wall.
You padded out the sill area by 2 1 4 with your 2 4 and 1 4 pressure treated wood then put your pvc trim which is 1 thick width unknown but i think its 6 as i said.
Using a table saw rip 1 1 2 inches off the top of a clapboard for a starter strip.
Install the flashing before you finish the top of the brick wall as the flashing must go behind the siding as well as behind and under the top row of bricks that angle outward to cover the top.
See more ideas about house exterior house colors exterior house colors.
What width is your water table over the stone.
May 23 2019 explore jessica keizer s board brick vinyl siding combinations on pinterest.
Production lines are set to go into the new plant in february of 2019.